×

Case Study

MHI air con system recovers waste energy at Bristol Airport

Bristol Airport

A 375kW air conditioning installation from Mitsubishi Heavy Industries (MHI) has just checked in at Bristol Airport. Twenty multi-split systems from MHI’s FD Micro Inverter range and 33 SAF fresh air heat exchange units service a hub of pre-boarding and arrivals areas plus a new two-storey walkway connection to the terminal building.

MHI air con system recovers waste energy at Bristol Airport

READ CASE STUDY

Send download link to:

I confirm that I have read and agree to the Privacy Policy.